Construction Guide for Prestressed Galvanized Corrugated Pipe
Prestressed galvanized corrugated pipes are widely used in post-tensioned prestressed concrete projects as protective sleeves for prestressing tendons (strands, wires, etc.). Their construction quality directly affects the safety and durability of the prestressed structure. Below is a detailed construction process and key considerations.
1. Pre-Construction Preparation
1.1 Material Inspection
- Corrugated Pipe Quality: Check for uniform zinc coating without damageHighway Metal Corrugated Pipe φ55/70mm Precast Beam Galvanized Corrugated Pipe, and ensure the pipe body is free from flattening or deformation.
- Sealing Performance: Ensure all joint accessories (e.g., connecting sleeves, waterproof tape) are complete to prevent grout leakage.
- Specification Matching: The diameter of the corrugated pipe should meet design requirements, typically 5~10mm larger than the prestressing tendon diameter.
1.2 Tool Preparation
- Cutting machine (dedicated corrugated pipe cutting tool, Highway Metal Corrugated Pipe φ55/70mm Precast Beam Galvanized Corrugated Pipe to avoid burrs)
- Waterproof tape/heat-shrink sleeves (for joint sealing)
- Tying wires/rebar supports (to secure the corrugated pipe position)
- Positioning and measuring instruments (to ensure accurate coordinates)
2. Corrugated Pipe Installation
2.1 Positioning and Fixing
- Positioning According to Design Coordinates: Use rebar supports or dedicated positioning bars to secure the corrugated pipe, with spacing ≤1m (reduced to 0.5m in curved sections).
- Curved Section Handling: Ensure smooth transitions and avoid sharp bends (minimum bending radius ≥30 times the pipe diameter).
- Height Control: The centerline of the corrugated pipe must align with the designed position of the prestressing tendon, with deviation ≤5mm.
2.2 Connection and Sealing
- Straight Pipe Connection: Use a corrugated pipe one size larger for sleeve connection, with overlap length ≥30cmHighway Metal Corrugated Pipe φ55/70mm Precast Beam Galvanized Corrugated Pipe, and wrap waterproof tape or apply heat-shrink sealing at the joint.
- Branch Pipe Connection: Use dedicated tees or cross fittings to ensure sealing.
- Vent Hole Setup: Reserve vent holes (Φ20mm plastic pipes) at the highest points of curves to prevent air accumulation during pouring.
2.3 Clogging Prevention Measures
- Insert temporary lining pipes (e.g., PE pipes or rubber rods) and remove them after initial concrete setting to prevent grout leakage and clogging.
- Check pipe patency before pouring, using high-pressure air blowers or hole cleaners if necessary.
3. Concrete Pouring Protection
- Avoid Vibrator Contact: Do not allow vibrators to directly contact the corrugated pipe to prevent damage or displacement.
- Leakage Inspection: Focus on monitoring joints; immediately flush the pipe with clean water if grout leakage is detected.
- Protection During Curing: Avoid external impacts or welding operations that could damage the zinc coating.
4. Prestressing Tendon Installation
- Installation Timing: Perform after concrete strength reaches 75% of the design value.
- Lubrication to Reduce Friction: Apply dedicated lubricant (e.g., wax-based material) inside the corrugated pipe before installation.
- Rust Prevention: Temporarily seal exposed ends of strands with waterproof tape after installation.
5. Common Issues and Solutions
Issue | Cause | Solution |
|---|---|---|
Corrugated pipe flattened or deformed | Excessive pressure during pouring | Increase support density, control vibrator distance |
Grout leakage clogging the duct | Poor joint sealing | Use double-layer tape + heat-shrink sleeves for enhanced sealing |
Difficulty in prestressing tendon installation | Pipe misalignment or local blockage | Pre-clean ducts and adjust positioning |
| Industry Category | Construction-Real-Estate |
|---|---|